MIL-P-80026C
4.1.1 Responsibility for compliance. All items must meet all requirements
of sections 3 and 5. The inspections set forth in this specification shall
become a part of the contractor's overall inspections system or quality
program. The absence of any inspection requirements in the specification
shall not relieve the contractor of the responsibility of assuring that all
products or supplies submitted to the Government for acceptance comply with
in quality conformance does not
all requirements of the contract.
Sampling
authorize submission of known defective material, either indicated or actual,
nor does it commit the Government to acceptance of defective material.
4.2 Classification of inspections. The inspection requirements specified
herein are classified as follows:
First article inspection (see 4.4).
a.
Quality conformance inspection (see 4.5).
b.
4.3 Inspection conditions. Unless otherwise specified (see 6.2.1) all
inspections, tests, and examinations shall be performed in an indoor facility
with ambient conditions of 65 to 90 degrees Fahrenheit and 20 percent to 90
percent relative humidity.
4.4 First article inspection. When first article inspection is required,
it shall be applied to the first article submitted in accordance with 3.1.
Unless otherwise specified (see 6.2.1), first article inspection shall consist
of the examination in 4.6 and all tests shall be cause for rejection.
4.5 Quality conformance inspection. A quality conformance inspection shall
be applied to each item prior to being offered for acceptance under the
contract.
Unless otherwise specified (see 6.2.1), the quality conformance
inspection shall consist of the examination in 4.6, the test in 4.7.1, and the
inspection in 4.8. Failure of the item to pass the examination, all tests,
and the inspection shall be cause for rejection.
4.6 Examination. The machine shall be visually examined to determine
compliance with all requirements of this specification.
4.7 Tests.
4.7.1 Operational test. The machine shall be operated at no load for not
less than 30 minutes. Proper operation of all controls, motors, adjusting
mechanisms, and accessories shall be verified during the trial period.
4.7.2 Performance tests. The machine's performance shall be tested by
operating the machine to perform sheet metal punching operations to determine
conformance with the requirements of 3.6 and Table I. The machine shall punch
not less than six holes each of the diameters specified
in table II and in
the material thickness and type as specified in table I.
requiring
4.7.3 Electromagnetic interference control tests. Equipment
electromagnetic Interference control shall be tested to determine conformance
with 3.3.8 using the procedures given in MIL-STD-462.